Load Transient Tests

To test/characterize how quickly the regulator responds to changing load conditions:

  1. Design the DIB with high-speed switches to switch in different loads. Turn-on time orders of magnitude faster than the regulator transients. Mechanical relays cannot be used as their turn on time is typically 5ms.
  2. Connect the output of the regulator to a high-speed digitizer/sampler on the tester.
  3. Capture the output while switching in a load. The digitizer is triggered at a known instant and then the load switch is closed. The regulator output may be unstable for some time and then settle.
  4. The captured waveform which is post-processed to determine how long it takes for the regulator output to settle within, say 1% of its final value.

load_transient_setup
© 2018 Copyright. For individual use only. No liability is accepted for any consequences of using information on Testips.com.